How to unassign In-Progress inspections

If you are not in a position to work on the Inspections assign to you, you can unassign the inspection free it up for reassignment to other operators.

This feature enables reassignment flexibility, facilitating inspection scheduling adjustments.

To Unassign a In-Progress inspection:

  1. In the Inspections screen, tap the My Inspections tab.
  2. Tap the In-Progress status inspection you want to unassign.
  3. Tap the More icon on the top right of the screen and choose Unassign.
    Figure 1. Unassign In Progress Inspection
    A message Are you sure you want to Unassign the inspection? is displayed. Tap Unassign. The inspection is moved from the My Inspections tab to the Open Inspections tab and the inspection is displayed with Partly Open status with the name of the operator who worked on it earlier. (You) is displayed only if the operator who worked on it views the inspection in the Open Inspections tab.