Copy an existing round plan when most of its content already matches the new inspection. Update the copied plan before publishing or scheduling it.
-
Click the Round Plans section on the left pane.
The Round Plans screen lists the draft and published
round plans.
-
For the round plan you want to copy, click
and select Copy.
The copy appears in the list with Draft status.
Figure 1. Copied Round
-
Click the copied round plan to view its details on the right, then click
Edit Plan.
Alternatively, double-click the round plan to open the edit screen.
-
Update the tasks and other details as required.
-
Publish the plan when it is ready.
The copied round plan is created as a separate Draft plan. The original plan is unchanged.
Next: Review the copied plan and update its locations, assets, sections, and tasks before previewing it.